Project Archive

  • Equipment Installations

    Lathe Install Turnkey Project: Unloaded Set and epoxied anchors Precision laser leveled Completed safely & on time Shear Installation Completed safely &

  • Pipe

    6″ and 8″ stainless pipe replacementOn this project we prefabbed pipe sections and then on down days cut out old carbon pipes

  • Repairs

    On this repair we got the call on December 30 about a burn through on a ladle. We were able to set

  • Design and Build

    Roll storage and transportation racksCoil Grab StandThis was a safety project for the mill. The guys needed a safer way to hook